Warehouse Floor Resurfacing Worcester
We provide warehouse floor resurfacing and industrial overlay systems across Worcester and the wider Worcestershire area. Existing concrete slabs in logistics, storage and manufacturing facilities are refurbished using bonded self levelling compounds, polymer modified cementitious overlays and resin finishes, specified to improve surface condition, levelness and daily performance under forklift and pallet truck traffic.
20 +
Years
Experience in Concrete Flooring
Our Worcester resurfacing work covers Worcester Six Business Park, Blackpole Trading Estates East and West, Great Western Business Park, Warndon, Shrub Hill and industrial areas alongside the A4440 Southern Link Road and M5 junctions 6 and 7. Projects range from long serving production plants and engineering workshops to modern distribution centres and last mile logistics hubs. We assess slab condition, prepare the surface mechanically and install an overlay system aligned with BS 8204, BS EN 206 and established UK industrial flooring practice.
Our Expertise
Our Process
STEP 1
We begin with a structured review of the existing concrete slab, identifying cracking, joint breakdown, impact damage, surface wear, contamination and any delamination or previous repairs. In Worcester this can involve modern logistics units at Worcester Six as well as older industrial buildings around Blackpole and Shrub Hill where multiple historic floor layers may be present. Defective areas are broken out and reinstated, joints are rebuilt where required and unsuitable coatings are removed. The slab is then mechanically prepared using grinding, shot blasting and diamond tooling to create a clean, profiled surface ready for a bonded warehouse floor overlay.
STEP 2
Once preparation is complete we install the specified overlay system. Options include polymer modified cementitious toppings where higher duty is required, cement based self levelling systems to improve levelness over larger bays and resin finishes where additional abrasion resistance, cleanability or chemical resistance is needed. Overlay thickness and flow are controlled to remove local undulations and refine regularity through racking aisles, pallet routes and loading zones in Worcester warehouses and industrial units at Worcester Six, Blackpole, Great Western Business Park and Warndon.
STEP 3
After installation the overlay is cured in line with system guidance and the agreed programme. On appropriate schemes, fast curing materials can allow controlled early access in roughly 24 to 48 hours, with full forklift loading and dense storage introduced once strength and surface hardness targets have been reached. Movement and construction joints are recut or reinstated so the slab can move as intended and future edge damage is reduced. At handover we complete finish checks and provide maintenance and operating guidance tailored to the Worcester facility and its duty profile.
Why Choose Us
Worcester’s industrial stock includes long established engineering and manufacturing buildings as well as newer logistics sheds, many with varied repair histories and coatings. We focus on substrate strength, moisture, contamination and surface profile so primers and bonding agents work as intended. A stable, well prepared base helps the overlay act compositely with the slab and reduces the risk of debonding or surface instability under daily forklift and pallet truck movements.
Many Worcester facilities support regional flows along the M5, A38 and A4440 Southern Link Road. We plan resurfacing activity around intake and despatch schedules, trunking runs and shift patterns, using phased work zones and temporary access where required. This helps maintain throughput while allowing adequate time for surface preparation, overlay installation and curing in busy warehouses and production buildings around the city.
Full slab replacement is disruptive and capital intensive, particularly in occupied Worcester units with installed racking, process lines and services. Resurfacing retains the structural slab where it is sound and renews the wearing surface with a system suited to the site’s duty. This can extend the working life of the floor, reduce the need for reactive patch repairs and support more predictable maintenance budgets across Worcester and the wider Worcestershire area.
Worcester and Surrounding Areas
We undertake warehouse floor resurfacing and industrial overlay projects across Worcester and Worcestershire, supporting logistics, storage and manufacturing facilities connected to the M5, A38 and A4440 corridors.
Worcester
Worcester Six Business Park
Blackpole Trading Estate East
Blackpole Trading Estate West
Great Western Business Park
Warndon and Berwick Industrial Estates
Shrub Hill and Diglis Basin Area
Droitwich and M5 Corridor
We provide warehouse resurfacing, slab repairs and industrial overlay systems throughout Worcester, including Worcester Six Business Park, Blackpole Trading Estates, Great Western Business Park, Warndon and surrounding areas. Our service covers surveys, defect repair, mechanical preparation and installation of bonded overlays matched to your loading, traffic and operating conditions.
Contact us to discuss a Worcester warehouse, manufacturing building or regional distribution facility, or to arrange a site visit and detailed proposal.
Or fill in the form below and our Worcester resurfacing team will respond promptly.
FAQ