Right arrow Warehouse Floor Resurfacing Chippenham

Chippenham Warehouse
Floor Resurfacing & Overlays

We provide warehouse floor resurfacing and industrial overlay systems across Chippenham and North Wiltshire. Existing concrete slabs are refurbished using bonded self levelling compounds, polymer modified cementitious overlays and resin finishes, selected to suit logistics, storage and production environments and to support long term structural performance.

20 +

Years
Experience in Concrete Flooring

Our Chippenham resurfacing teams work around Bumpers Farm Industrial Estate, Methuen Park, Greenways Business Park and SouthPoint on the A350, supporting warehouses, trade counters and production units. Floors are surveyed, repaired and overlaid to improve levelness, surface durability and the way materials handling equipment performs day to day.

Our Expertise

Right arrow Our Process

How We Resurface Warehouse
Floors in Chippenham

STEP 1

Floor Survey
& Substrate Preparation

Every project starts with a condition survey of the existing concrete slab. We review cracking, joint damage, surface wear and impact from racking legs and fork truck routes, which are common in units around Bumpers Farm and Chippenham Business Park. Defective areas are broken out and reinstated, joints are rebuilt where necessary and the surface is mechanically prepared through grinding, shot blasting and diamond tooling, creating a stable, textured base ready for the warehouse floor resurfacing system.

Right facing arrows STEP 2

Overlay Installation
& Level Control

Once preparation is complete we install the specified industrial floor overlay. Options include polymer modified cementitious toppings, cement based self levelling systems and resin finishes selected around loadings, environment and cleaning regime. Thickness is controlled to restore tolerances across large bays and improve regularity in racking aisles, picking zones and loading areas. Overlays are designed to support forklift and pallet truck traffic typical of Chippenham distribution, engineering and light manufacturing facilities.

Right facing arrows STEP 3

Curing, Joints
& Handover

After placement, the overlay is allowed to cure in line with manufacturer guidance and the agreed programme. Fast track systems can permit carefully controlled traffic in 24 to 48 hours, subject to temperature and ventilation, with full mechanical loading introduced later. Movement and construction joints are cut or reinstated to manage future movement and reduce edge damage. Before handover, we review surface quality and, where required, flatness and regularity, then provide maintenance and operating guidance tailored to the Chippenham site.

Right arrow Why Choose Us

Industrial Floor Overlays for
Stable, Level Operation

Warehouse floor resurfacing in Chippenham logistics unit
Load capacity icon

Surface Preparation
and Bond Integrity

The life of a warehouse floor overlay depends on how well it bonds to the underlying slab. Our teams in Chippenham use mechanical preparation methods to remove laitance, coatings and contamination and to achieve a consistent surface profile. Combined with suitable primers and bonding agents, this approach helps prevent debonding, blistering and edge failures and creates a composite system that performs under repeated forklift and pallet truck movements.

Industrial floor overlay installation in Chippenham warehouse
Surface profile icon

Programme and
Access Management

Many Chippenham units operate extended hours and serve wider regional networks via the M4 and A350. Resurfacing works are planned around delivery slots, shift patterns and seasonal peaks, using phased zones, temporary routes and night working where appropriate. By pairing this with rapid curing overlay systems, we help sites reduce downtime while still achieving the preparation and curing periods required for a reliable industrial floor overlay.

Resurfaced concrete warehouse floor in Chippenham and North Wiltshire
Repair efficiency icon

Service Life
and Cost Efficiency

Full slab replacement is disruptive and capital intensive, particularly where racking, services and automation are already installed. Resurfacing allows the main concrete structure to remain where sound, renewing only the wearing surface with an overlay designed for abrasion resistance, impact and long term smoothness. For Chippenham warehouse operators this can extend the usable life of the floor while limiting downtime and avoiding major structural works.

Right arrow Chippenham and Surrounding Areas

We deliver warehouse floor resurfacing and industrial overlay projects across Chippenham and North Wiltshire, supporting logistics, storage and production facilities connected to the M4 and A350 corridors.

Chippenham

Bumpers Farm Industrial Estate

Methuen Park

Greenways Business Park

SouthPoint Business Park

Corsham

Lacock

Calne

Request a Quote for Warehouse Floor Resurfacing in Chippenham

We undertake warehouse resurfacing, concrete repairs and industrial floor overlay systems throughout Chippenham, including Bumpers Farm, Methuen Park and surrounding business parks. Our service covers surveys, surface preparation, joint and slab repairs and installation of self levelling, cementitious or resin based systems matched to your loads and operating profile.

Contact us to discuss a specific warehouse, logistics unit or industrial floor in the Chippenham area or to arrange a site visit and quotation.

Or fill in the form below and our Chippenham resurfacing team will respond promptly.

Right arrow FAQ

Warehouse Floor Resurfacing Chippenham
Common Questions

What types of Chippenham warehouse and industrial floors do you resurface?
We work on a wide range of floors including logistics units at Bumpers Farm, business park warehouses, production areas and trade units. Floors can normally be resurfaced where the existing slab and sub base are structurally sound and suitable for receiving an industrial floor overlay.
How do you decide which overlay system is appropriate for a Chippenham project?
System selection is based on slab condition, loading, type of MHE, exposure to chemicals or moisture and cleaning regime. We use cement based self levelling systems, polymer modified cementitious overlays and resin finishes, and will recommend an approach that suits the operational requirements of the specific Chippenham site.
Can resurfacing be carried out while our Chippenham warehouse stays operational?
Yes. Many projects are completed in live environments. Works can be phased by area with defined work zones, temporary pedestrian and vehicle routes and, where appropriate, night or weekend shifts. This allows operators around Bumpers Farm, Methuen Park and other estates to maintain core activity while resurfacing is underway.
How do you treat joints and localised damage before installing an overlay?
Joint arrises and damaged areas are repaired before any overlay is placed. This may include cutting out failed concrete, reinstating joint edges with appropriate repair mortars and reforming movement or construction joints. Addressing these issues in advance helps to minimise reflective cracking and improves forklift ride quality on the finished surface.
How soon can forklifts and pallet trucks use a resurfaced floor?
Return to service times depend on the overlay system, thickness and site conditions. Some fast track self levelling and resin systems can accept light traffic within 24 to 48 hours, with heavier forklift and racking loads introduced later. We provide project specific guidance so that Chippenham operators can plan stock movements and access around the programme.
Is resurfacing suitable for high bay and narrow aisle layouts in Chippenham warehouses?
Yes. Overlays can be detailed to support high bay racking and narrow aisle configurations, with attention to levelness, regularity and joint detailing. This helps protect MHE, supports guidance systems and improves overall running characteristics in busy aisles and picking zones.
What information helps you prepare a quotation for a floor in the Chippenham area?
Useful information includes approximate floor area, current slab condition, known issues, building age, type of MHE and loads, any planned layout changes and available access times. Photographs, survey reports and layout drawings also help us to propose a suitable resurfacing solution and programme for your Chippenham facility.